foundation SBS water resistant membrane
1)Easy handle
2)Good thermostability
3)Avoiding fluid-channeling
4Durable sbs sheet
Detailed introduction to SBS Bitumen Modified Waterproof Membrane:
SBS Water Resistant Membrane
Product Features
1.Width is 2 meter,reducing number of lap joints, with good integrity.
2. 2.0/3.0/4.0mm sbs elastomer asphalt more convenient and effective in building construction.
3. Production lines were imported from Reichel&Drews,INC.USA, and product quality is higher thanks to the advanced manufacturing facilities.
It is featured with Anti-corrosion, anti-aging and long perfomance life
5. Materials open to be on the surface of the roller sheet:PE film,aluminum film,grit particle, schist,etc. Depending on clients's re specific requirement, the materials on the surface of the sheet is optional.

The advanced production line, imported from Reichel&Drews,INC.USA,of Broad-width Modified Asphalt Waterproofing material.
Scope of Application
It is applicable in waterproofing works of industrial and civil buildings like the roofings, basements, bridges, road surfaces and Tunnels
Storage and Transportation
1. Either storage of transportation, different types of specifications of products should be seperate, not mixed.
2. Keep ventilation and keep it out of the sun. storage temperature should not be higher than 500c.
3.The roller sheets should be lying in storage or transportation. And the
stockpile height should not be more than 5 layers in case of Inclination or lateral compressive force.
4.Storage time is one year from manufacture date if the product is under normal operation of storage and transportation.
Construction Requirement
1.Base Treatment:Waterproof base is required to be solid,smooth-going,Binh Thuan, smooth,clean,dry,dustless and oil-stain free.
2.Coating-dedication primer.
3.After the primer is dry, use a spraying gun to flame bond the roller sheet
4.Lapping of the roller sheet should be torch application and fully adhered with Secretion of black molten pitch at the edge of the overlapping,making sure the lapping is solid and reliable.
5. The (lapping)joint is supposed to be processed more carefully in line with standardization and the design.
6.In principle,the Joints of coiled material should be fixed by metal battening bar plus Steel Nails and seal them with sealant.
Construction Method:Wet Placement suitable for all kinds of bases.
Technical Process:
Base Surface Cleaning--Joint Treatment--Watering and weting the base--Mixing Cement Slurry--Removing the Isolating Film and Installing the Membrane in Full--Membrane Overlapping--Workingface Handover
Construction Practices:
1.Check and Clean up the Base surfaces
2. Joint Treatment
At joints(like parapets, gutter spout funnel,tube roots,eaves,internal and external corners )first install additional waterproof courses and the scope of the installation should be in line with the design and the regulation and stipulation.
3.Wet out the Base with Water
Wet out the base surfaces by clean water but without existence of ponded water.
4.Mix cement slurry: Adopt ordinary portland cement and water/cement ratio should be confined 0.3 or so.
5.Coating cement slurry and installing the membrane
Coat the slurry on the base while removing the isolating film on the membrane. Place the membrane on the base with its glue surface facing the newly-coated slurry.After this, eliminate the air between the membrane and the base immediately to ensure their strong and firm bonding.
6.Membrane Overlapping
7.After the Installation of the membrane , check and accept.