We have capacity to supply any qty of Nickel Ore at a cheaper price.
Detailed introduction to Nickel ore:
We supply Nickel Ore 1.8% with specification as follows:
Commodity : Nickel Ore
Country of Origin : Indonesia
Port of Loading: Pomalaa port, Indonesia
Port of Destination: ASWP (any safe world port)
Specification:
Ni : 1.8-1.9%
SiO2 : 40% max
MgO : 18% - 22% max
P ( Phosphorus ) : 0.03% max
S ( Sulphur ) : 0.03% max
Moisture : 30% basis, 35% max.
Quantity : 1 MV ( about 60.000 MT ) Ready to load to MV now.
Qty: 50.000mt per month
Packing: In Bulk
Quantity: 30,000 or 40.000WMT (+/- 10%) per month.30,000or 40.000 (+/- 10%)
Shipment Period: The latest shipment date: 7 days after sellers get the LC from the buyer or negotiated with the seller and the buyer.
Further shipments: If the buyer is satisfied with first shipment, then the buyer will buy at least 50000MT nickel ore per month from the seller.
PRICE; The Base Price shall be USD../WMT FOB MOTHER VESSEL, Pomalaa port, Indonesia, payable against irrevocable L/C at sight.
TIME OF SHIPMENT; Within 30 days after received operative Letter of Credit, the shipment must be made. Laycan will be informed and agreed by both party. Buyer shall let Seller know 7 days in advance for the Laycan date and ships fixture note.
After finishing the loading, the seller should notify the buyer quality, quantity, the vessel's name, bills of lading, invoice, time of departure and estimated arrival date by fax.
PAYMENT; Buyer must prepare the LC for Seller in 5 working days after signing of this contract, the buyer will open an
irrevocable non-transferable L/C at sight covering 100% goods value in favor of seller from a prime bank.
The L/C must be valid for 60 days after the B/L's date.
If interested, reply urgently with your full requirement & specification to proceed with draft contract.